Results
Home / Results
More of our
Results
Outputs:
- A research at national level with international partners & solutions for obtaining green energy withouth damaging the environment
-
A billateral partnership between institutions at international level - Partnership Agreement
UTI & UPB - Romania
NTNU & SINTEF - Norway
Outcomes:
- 1 study with all the locations of all the non-powered dams at national level
- 1 study regarding the approx. 100 locations with potential for retrofitting
- 1 report and a database describing the potential sites that can be used for retrofitting dams with -hydropower facilities
- 1 study for 10 chosen locations with potential, that deserve to be retrofitted with priority
- 1 advanced documentation (Documentation for approving the intervention works)
- 1 Study report: Hydrological data analysis, environmental impacts, mitigation & hydropower potential evaluation
- 1 Study report: Solutions for individual equipping of each selected site with hydraulic turbine/pump and/or mechanical components, presenting their advantages and disadvantages in terms of technical performances.
- A Technical Pilot Project - a design for a future hydroenergetic arrangement
- Two articles with IPR protection: publication in international research journals